Duty Planner
Drag a duty onto a team member’s day to allocate it.
20–26 Jul 2026
Duty Details
Allocation warnings
Every duty carries its own date, set on Add Duty, so it can only be dropped in that date’s column — the column lights up as you start dragging. Changing the date is an edit to the duty, not a planner action. A shift mismatch is blocked outright; a date whose weekday falls outside the duty’s Days Operable is allowed but flagged here, as is any overlap in a team member’s times. Auto-allocate walks the unallocated list one duty at a time and gives it to the first team member who is rostered for that duty’s shift (Reference Data › Member Shifts), has no clashing times, and is under the limit of 3 projects that day. A duty whose shift nobody free can work is left unallocated and reported here.